The brief asked for one thing: a single revenue report, pulled together from three source systems, ready for the monthly board pack. Six weeks later, the requirements document listed fourteen more data sources, two real-time dashboards, a customer segmentation model and an integration nobody had costed. The sponsor was still waiting for the report that started it all.
We see this often. A project with a clear first goal slowly turns into a programme with no end date. The budget gets eaten by change requests, and the sponsor starts getting questions about cost, timing and ownership that they can't answer.
The technology is rarely the problem. Microsoft Fabric, like any modern data platform, can deliver value quickly. The problem is that the work was never tightly defined enough to protect the sponsor, the budget or the people delivering it.
Data projects grow by their nature. Each new data source you connect shows you three more that "should probably be included". Each report you build raises a follow-up question that needs more data. That's not necessarily a problem. It often means people can see more possibilities once the work starts.
The problem is trying to accommodate those possibilities inside the first piece of work. Without a clear boundary around the first deliverable, the list of requirements keeps growing before anything useful goes live.
Costs go past the original approval and timelines stretch. The sponsor loses confidence in the delivery partner and in the business case they signed off. The project that was meant to prove the value of data becomes the example the CFO uses against the next budget request.
It's a specific deliverable that can be tested and has one owner. For example: "A consolidated monthly revenue report from three named source systems, signed off by the Finance Director against the general ledger, delivered in eight weeks."
That one sentence covers what's being delivered, which data is in scope, how you'll know it's right, who owns it and when it's due. Anything outside it is a change, and changes have a price.
This isn't about limiting ambition. Getting the first outcome right builds trust, working habits and foundations that make the second and third outcomes faster and cheaper. Trying to do everything at once is what makes programmes stall.
Ask any delivery partner these questions before you sign a contract. If they can't give you clear answers now, they're unlikely to become clearer once delivery starts.
A fixed price means the agreed scope is delivered for the agreed cost. If you add something, it becomes a new agreement with its own scope and price. The sponsor knows what they're paying for and the delivery team knows what they're building.
Delivery also depends on both sides. If data access or business decisions arrive late, the timeline can move. A good agreement names those dependencies at the start and says what happens if they slip.
TXP FabricWorks is our service for building data platforms on Microsoft Fabric. Each build includes a Fabric lakehouse, data pipelines, a semantic model and Power BI reporting, designed in line with Microsoft's Well-Architected Framework for Fabric. Every build goes through review, testing and user acceptance testing with the client.
Each engagement starts with a paid discovery that agrees scope, price, acceptance criteria and timeline. If the build goes ahead, we credit the discovery cost against it.
At handover, the agreed deliverables are yours. You get the pipelines, models and reports included in the scope, along with full documentation and training so your team can extend them or work with another provider.
We can provide an ongoing managed service where that’s useful, but the platform shouldn’t depend on TXP being there forever.
Take the six questions into your next conversation with a delivery partner. If the answers are clear, specific and written down, you have the basis for a well-defined engagement. If they're vague, you've learned something useful before committing the budget.
Learn more about TXP FabricWorks: [Editorial link task: link to the TXP FabricWorks campaign landing page once the URL is confirmed.]
If you have a Fabric project that needs a clear first boundary, talk to our data and AI team. We can help you scope the first outcome and work out what belongs in the initial build.
It often starts with a first outcome that hasn't been defined tightly enough. When nobody has agreed the deliverable, the data it needs and how it will be accepted, new requirements can enter the project without anyone making a clear decision about scope, cost or timing.
Fixed price works when the scope is agreed and clearly bounded. It gives the sponsor cost certainty and protects the budget approval. New requirements can still be added, but they should be treated as changes with their own scope and price.
You should know which deliverables become yours, have the documentation needed to understand them and be clear about what would be required to maintain or develop the platform. The aim is to avoid a situation where only the original delivery partner can work with what has been built.
For TXP, paid discovery is part of defining the engagement. It establishes the scope, acceptance criteria, price and timeline for the proposed build. If that build goes ahead, the discovery cost is credited against it.